A sneak peak
09/14/2022
We were able to get a two photos of the building under construction. We expected to see a floor and some framing but the workers are seeming ahead of schedule and the building looks almost complete. The doors and windows are installed and the exterior is painted and trimmed. The front porch needs to be completed and any other final touches, then the building will move be inspected. After inspection, the job ticket will move to the schedulers to contact us and a date will be set for the delivery of building #1.